• Home
  • Work With Us
  • Inspiration
  • More
    • Home
    • Work With Us
    • Inspiration
  • Home
  • Work With Us
  • Inspiration

Direct to the Public + Trades*

Kitchen drawings

1) Planning

You've made the decision to start your cabinetry renovation. Take this opportunity to gather inspiration, essential ideas, appliance specifications, and, most importantly, establish your budget. This information will help you and your designer align your renovation goals effectively.

2) Consultation

We recommend an initial meeting at our showroom. Here, you can experience the quality of our work firsthand. We'll discuss your wants, needs, and budget, laying the groundwork for your project.

3) Design

Our team will visit your home to take precise measurements of your kitchen space. This information will be used to create preliminary drawings and budget estimates, a process that can take from a few days to over a week, depending on the project size. Afterward, we’ll invite you back to our showroom to review our vision for your kitchen and address any changes, questions, or concerns until we finalize a plan that meets your satisfaction.

4) Contract

Once the design is approved, we’ll finalize the details and prepare a sales contract for you. At this stage, a deposit of 50% will be required to proceed.

5) Final Measurement

After you’ve confirmed your selections and signed the drawings, we’ll arrange for any necessary final measurements to ensure everything fits perfectly.

6) Build

Following the approval of your final drawings, we will submit them for production. The average build time in our shop is between 6 to 8 weeks, depending on thea complexity of your project. This period allows for plumbers, electricians, and other tradespeople to complete their tasks before installation.

7) Delivery

Your cabinets will typically be delivered by our team the day before installation. Please ensure there's adequate space outside the installation area for delivery, and clear the area of any furniture or appliances.

8) Countertops

On the final day of installation, the countertop fabricator will take measurements to avoid any delays. Please note that it typically takes 2-3 weeks post-measurement for countertops to be installed. During this time your kitchen may be without running water, so plan accordingly.

9) Completion

It's important to understand that most kitchens require multiple visits for delivery and installation. Service calls and additional parts may be necessary, as each cabinet contains up to 20 components. Potential issues—like measurement inaccuracies, build errors, shipping damage, or installation errors—can affect your timeline. We’ll work tirelessly to address any concerns as they arise.

* Ask about our Annual Volume Rebate Program!

let's get started

Book a Showroom AppointmentGET A QUOTEI'M READY TO ORDERLEAVE A REVIEW

WEEKDAYS BY APPOINTMENT ONLY:

1601 Welch St., North Vancouver BC V7P 3G9

236-481-0624 hello@backbonecabinetsolutions.com


Copyright © 2026 Backbone Cabinet Solutions -

All Rights Reserved.

Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept